A river authorized for study under Section 5(a) of the Wild & Scenic Rivers Act is subject to the conditions and restrictions specified in Sections 7(b), 8(b), 9(b), and 12(a) of the Act.

The river is protected for the duration of the study plus up to three years after the required report is submitted (along with the President’s recommendation) to Congress. Should Congress not act within the three-year time frame, the river is no longer afforded protection by the Wild & Scenic Rivers Act. In cases where a study has not been submitted to Congress, the statutory protections...

It is important to develop and apply standardized criteria through a documented evaluation process that may include a screening for potential wild and scenic rivers. If there doubt, evaluate the river according to the criteria in the Wild & Scenic Rivers Act, i.e., free-flowing condition and outstandingly remarkable values.

Section 7 of the Wild & Scenic Rivers Act prohibits any department or agency of the United States from assisting in the construction of any water resources project that would have a “direct and adverse” effect on the values for which the river segment was established, namely its free-flowing condition, water quality, and outstandingly remarkable values (outstandingly remarkable values). It also precludes federal assistance to projects below or above a designated river that have been determined to “invade the area or unreasonably diminish the scenic, recreational, and fish and wildlife...

No.  The Interagency Wild & Scenic River Guidelines state, “There are no specific requirements concerning the length or the flow of an eligible river segment.  A river segment is of sufficient length if, when managed as a wild, scenic or recreational river area, the outstandingly remarkable values are protected.  Flows are sufficient if they sustain or complement the outstandingly remarkable values for which the river was designated.

Yes. River-administering agencies have an affirmative duty to evaluate pre-existing uses on federal lands to determine whether such uses are protecting the values for which the wild and scenic river was designated. Grazing may continue when consistent with protecting river values. If grazing practices are determined to be inconsistent with wild and scenic river management objectives, then changes in grazing practices may be required.

There are no known studies comparing river use levels before and after wild and scenic river designation with changes in use levels of similar non-wild and scenic rivers. Factors other than wild and scenic river designation (i.e., river and water attributes, access to the river, and availability of facilities and commercial services) are considered to be the major influences on river use levels. For wild and scenic rivers, as for other rivers managed by federal agencies, the implementation of permit systems or other limits of use are typically undertaken when use exceeds an acceptable...

Camping is often important to the enjoyment of wild and scenic rivers. As appropriate, and when private interests do not provide sufficient facilities, the federal managing agency attempts to provide them on federal lands. As a condition of use, consistent with river classification and the management objectives for the river area, the managing agency may specify that camping will be permitted only in designated locations. Enforcement of camping restrictions and limitations can be through indirect means (brochures, maps, signs, etc.) and/or direct means (permits, enforcement personnel, etc...

Most current uses and activities on rivers and adjoining federal lands may continue. Of primary consideration in any river or land-use limitation is the protection and enhancement of the free-flowing condition, water quality, and outstandingly remarkable value(s) that resulted in the river’s designation. Those uses that clearly threaten these values will be addressed in the planning process, or through site-specific environmental analyses on a case-by-case basis where federal lands are involved.

For state-designated rivers, a governor may submit an application to the Secretary of the Interior under Section 2(a)(ii) of the Act.  If found eligible, and if sufficient protection is afforded by the state, the Secretary may make the designation.  Rivers designated in this manner continue to be administered by the state (sometimes with assistance from local governments), except for any federal lands along the river.  If there are federal lands located along the river, the state and federal river-administering agencies may enter into an agreement to outline federal/state...

Upon congressional authorization for a study (Section 5(a)) or by federal agency initiative (Section 5(d)(1)).

Circumstances where agencies should always seek information and advice from each other are:

  1. In agency inventory and planning processes, and environmental analysis processes for aquatic ecosystems and regional watersheds; and,
  2. When proposed actions have the potential of affecting other agency-administered portions of the river.

(*For certain rivers, Congress directed the river-administering agency in Section 3(b) to determine which classes “best fit the river or its various segments.”  These administratively segmented rivers should reflect on-the-ground practicalities and, therefore, are unlikely to require subsequent amendment.)

Yes. While Congress specifies the segment divisions of a designated river, in some instances congressional language may require interpretation. For example, a segment division between a wild and scenic classification described as “from the bridge”...

Yes. The Wild & Scenic Rivers Act directs other federal agencies to protect river values. It explicitly recognizes the regulatory roles of the Federal Energy Regulatory Commission and the Environmental Protection Agency in protecting wild and scenic rivers, and directs other federal departments and agencies that permit or assist in the construction of water resources projects to do likewise. The role of such federal agencies in water resources project construction may be through regulation, direct funding, or indirectly funding by providing federal assistance to others.

All...

There are more appropriate and cost-effective ways to ensure resource conservation along wild and scenic rivers than using the Wild & Scenic Rivers Act’s condemnation authority. (Refer to Protecting Resource Values on Non-federal Lands (1996).)

Agencies may acquire properties using appropriated funds under the Land and Water Conservation Fund Act or other authorities. Owners are contacted in order to see if an exchange or voluntary purchase can be negotiated.

Section 4(a) of the Wild & Scenic Rivers Act and the Interagency Guidelines describe and discuss content requirements, specific topics to be addressed, and the way in which information should be presented in such a study report. The National Environmental Policy Act (NEPA) process can, and is, readily merged with the requirements of the wild and scenic river study report. A wild and scenic river study report resulting from a decision in a land management plan usually summarizes and incorporates relevant information from the plan and associated NEPA document. For example, the location...

Yes. There are four other principal agencies with authority on rivers, including wild and scenic rivers, in the United States. The EPA has authority to protect water quality; the Army Corps of Engineers (ACOE) has jurisdiction for water resources projects; the U.S. Coast Guard (USCG) has jurisdiction on inland navigable waters, vessel inspecting and licensing, safety and boating enforcement, aids to navigation, and permitting of bridges; and the Federal Energy Regulatory Commission (FERC) has authority to license the construction of hydroelectric projects.

Wild and scenic river designation does not change land ownership or grant new privileges to the public on private lands. If the riverbanks are in private ownership, the landowner continues to control their use after designation. Ownership of the bed and bank of a river may be affected by whether the river is determined navigable.

On September 7, 1982, the Departments of Agriculture and the Interior outlined in the Federal Register (47 FR 39454) eligibility and classification criteria, the evaluation process and content, and reporting requirements for potential wild and scenic rivers and management guidelines for designated wild and scenic rivers. These guidelines were formulated to provide a uniform evaluation and consistent management approach in the identification, evaluation, reporting, and management of wild and scenic river segments. These replaced earlier guidelines developed in 1970.

The requirements specified for a CRMP in Section 3(d)(1) are most often developed through a separate-in-time planning process. This can result in either an amendment to the direction in the agency’s unit-wide plan o a stand-alone plan, depending on agency practices. For designated rivers that are separate NPS units, the CRMP is the General Management Plan (e.g., St. Croix National Scenic Riverway).

Benefits may include, but are not limited to, providing managers tools or mechanisms to protect free-flowing condition, i.e., protection of river values through the assessment of hydroelectric facilities or water resource development projects within the designated reach; protection and enhancement of water quality and outstandingly remarkable values; and, if a river’s management plan objective, promotion of economic development, tourism, or recreational use. Based on current limited studies, indications are that property values remain stable or increase on designated rivers. This is often...

In the Wild & Scenic Rivers Act, river values identified include scenic, recreational, geologic, fish and wildlife, historic, cultural, or other similar values. The Wild & Scenic Rivers Act does not further define outstandingly remarkable values. However, agency resource professionals have developed interpretive criteria for evaluating river values (unique, rare, or exemplary) based on professional judgment on a regional, physiographic, or geographic comparative basis. (Refer to The Wild & Scenic River Study Process (1999).)

Yes, a CRMP is developed in compliance with the NEPA. The purpose and need for the proposed action is to protect and enhance the values for which the river was designated (free-flowing condition, water quality, and outstandingly remarkable values), within its classification(s). The proposed action establishes appropriate goals, objectives, and/or desired conditions to meet those purposes. Alternative courses of actions are developed and analyzed relative to achieving overall goals and desired conditions within the wild and scenic river corridor. A “no action” alternative, representing the...

Local government entities are encouraged by federal wild and scenic river-administering agencies to provide for the protection of wild and scenic river values in their land use plans, including the use of zoning and other land use measures. Their participation in development of the comprehensive river management plan (CRMP) in areas of mixed ownership is essential to ensure an enduring planning strategy that protects river values and respects the rights of landowners. In some cases, local governments have chosen to strengthen land-use requirements during a wild and scenic river study, in...

(*For some rivers, Congress has directed the river-administering agency in Section 3(b) to determine which classes “best fit the river or its various segments.”  These administratively segmented rivers should reflect on-the-ground circumstances and, therefore, are unlikely to require subsequent amendment.)

Yes. In a very few cases, the legislation designating a river erroneously describes a segment division and needs to be amended to fit on-the-ground circumstances. For example, the designating language for the Upper Rogue Wild & Scenic River...

The Wild & Scenic Rivers Act states that rivers designated under Section 2(a)(ii) “shall be administered by the State or political subdivision thereof without expense to the United States other than for administration and management of federally owned lands.” The state is responsible for providing protection, except on federally administered lands and with respect to Section 7(a) determinations and securing a federal reserved water right under Section 13(c), both of which are made by a federal agency. The National Park Service provides ongoing technical assistance and partnership...

Section 16(b) of the Wild & Scenic Rivers Act, defines a “river” as “a flowing body of water . . . or portion, section, or tributary thereof. . . .”  “Free-flowing” is defined as “existing or flowing in natural condition without impoundment. . . .”  Therefore, any section of river with flowing water meets the technical definition of free flowing, even if impounded upstream.

Suitability is an assessment of factors to provide the basis for determining whether to recommend a river for addition to the National Wild & Scenic Rivers System. Suitability is designed to answer these questions:

  1. Should the river’s free-flowing character, water quality, and outstandingly remarkable values (ORVs) be protected, or are one or more other uses important enough to warrant doing otherwise?

  2. Will the river’s free-flowing character, water quality, and ORVs be protected through designation? Is it the best method for protecting the river corridor...

Designation may cause an increase in use along the river as new visitors seek it out. However, the wild and scenic river management requirements should ensure that any such increase will not damage resources on private property. If anything, there will be increased oversight after designation, discouraging littering, trespass and vandalism. Private landowners may continue to post their property with “No Trespassing” signs or require users to obtain landowner permission.

No. The protection afforded by Section 7(b) of the Wild & Scenic Rivers Act does not apply to Section 5(d)(1) study rivers. However, the managing agency should, within its authorities, protect the values which make the river eligible or suitable (free-flowing condition, water quality and outstandingly remarkable values).

Review of hydroelectric and federally water resources projects under Section 7 of the Wild & Scenic Rivers Act is complex. Please refer to Wild & Scenic Rivers Act: Section 7 (2004), a technical report of the Interagency Wild and Scenic Rivers...

The government typically provides technical assistance to find ways to alleviate or mitigate the actual or potential threat(s). Purchasing a partial right (easement) or the property in fee title is usually the last resort. If an easement is purchased, the owner would sell certain development rights and receive a payment, yet retain title to the land.

Easements on private lands acquired for the purposes of protecting wild and scenic rivers do not provide public access unless this right was specifically acquired from the private landowner. A trail or road easement by necessity would involve public use provisions. Any provisions for public use of private lands must be specifically purchased from the landowner.

Most rivers have flexible boundaries to accommodate specific features and river values. (Refer to Establishment of Wild and Scenic River Boundaries (1998).)

River segments may be tentatively classified for protective management purposes prior to a final suitability determination and/or congressional action.  This ensures that river values and characteristics are protected (subject to agency policies and standards) until the evaluation process and possible designation is completed.

Yes, a federal reserved water right is generally adjudicated in state court (e.g., basin-wide adjudication) in the western United States. It is less clear how federal reserved water rights are adjudicated in the eastern United States. Contact a staff expert and/or legal counsel when trying to protect water quantity.

 

Water law is a complex legal area, and water rights are a highly contentious issue. Whenever a water allocation issue arises, a river manager should consult with staff with water rights expertise and, as necessary, seek legal counsel....

Yes. The “equal footing” principle of the Constitution and the Submerged Lands Act of 1953 afford each state the ownership of lands and natural resources under navigable rivers. These submerged lands generally extend from bank-to-bank or to the mean or ordinary high water mark.

There are three instances when federal agencies assess eligibility: 1) at the request of Congress through specific authorized studies; 2) through their respective agency inventory and planning processes; or 3) during National Park Service evaluation of a Section 2(a)(ii) application by a state. River areas identified through the inventory phase are evaluated for their free-flowing condition and must possess at least one outstandingly remarkable value.

No, not unless necessary to protect public safety, the river’s water quality, or other resource values. Recreational use of our nation’s rivers is increasing in both magnitude and extent, i.e., the types of recreational activities pursued and the technologies being used. Whether and how to restrict recreational use is a key issue in the planning process, which includes extensive local, regional, and national public involvement.

No. Navigability determinations are based on factors other than wild and scenic river designation. Because of this, designation does not affect ownership of the submerged lands [or minerals lying] under the river.

No. The public’s right to float a particular river does not change with designation. Neither does designation give river users the right to use, occupy, or cross private property without permission.

A Section 5(d)(1) study river is protected to the extent of each study agency’s authority and not by the Wild & Scenic Rivers Act. Each agency’s policy is to protect eligible rivers and rivers determined suitable for designation for the life of the respective agency land use plan. A river determined not suitable for designation need no longer be protected as a potential addition to the National Wild & Scenic Rivers System once the study, with its related decision document, is completed.

Boundaries are measured from the ordinary high water mark of the outermost stream channel. That is, boundaries will be measured from the outermost braid unless otherwise specified by Congress. This is typically considered during the suitability determination and in the development of the final river corridor boundary.

Corridors may not exceed an average of 320 acres per river mile over the designated portion of the river (except on certain other rivers as specified by Congress and in Alaska, which is 640 acres for rivers located outside national parks). Agencies delineate boundaries based on natural or manmade features (canyon rims, roads and ridge tops, etc.) and legally identifiable property lines.

Amending the lateral boundary of a designated river requires analysis and decision under the National Environmental Policy Act (NEPA). The environmental analysis process need not be complicated and may only require the proposed action and a no-action alternative. Amendment of a wild and scenic river boundary may also be timed with revision of the comprehensive river management plan and related decision under the NEPA. In either case, notice of the amended boundary should be published in the Federal Register and the legal description and maps forwarded to Congress and made...

Yes, but with many restrictions. It is important to note that condemnation is a tool that has been used only rarely on wild and scenic rivers. The objective of wild and scenic river designation is to protect and, as possible, enhance the values which caused the river to be designated. Should some proposed or actual use clearly threaten the values the river was designated to protect, the river managing agency would work with a landowner to explore ways to avert the threat through local zoning, state provisions, land exchanges, or purchases on a willing-seller/willing-buyer basis....

River access is evaluated in the land use planning process.  Specific access needs for public enjoyment, as well as any limitations, are determined in the river management plan.  In keeping with the requirements of the Wild & Scenic Rivers Act, “wild” rivers are generally inaccessible, except by trail (no roads); “scenic” rivers are accessible by road, which generally don’t parallel the river; and “recreational” rivers may have parallel or crossing road and railroad access.

Yes. While Congress specifies the termini of a designated river, in some instances congressional language may require interpretation. For example, a terminus described as “from the dam” could be interpreted as including the dam and dam-related facilities. However, to allow for continued dam maintenance, it may be appropriate to establish the boundary a very short distance below the dam or, through specific language, to exclude appurtenant facilities.

The river administrator is well advised to consider on-the-ground practicalities at the initial boundary setting stage, to the extent...

The federal wild and scenic river-administering agency is responsible for implementing the Wild & Scenic Rivers Act’s requirements, including the development of a comprehensive management plan for each river within three full fiscal years from the date of designation. It is also responsible to protect and enhance a river’s values, through its authorities on federal lands and through voluntary, cooperative strategies developed with other governments, tribal nations, and landowners on non-federal lands, and to evaluate water resources projects under Section 7(a).