The Act provides a national policy and program to preserve and protect selected rivers, or segments of rivers, in their free-flowing condition in the National Wild & Scenic Rivers System.  Section 1(b) of the Act states:

It is hereby declared to be the policy of the United States that certain selected rivers of the Nation which, with their immediate environments possess outstandingly remarkable scenic, recreational, geologic, fish and wildlife, historic, cultural, or other similar values, shall be preserved in free-flowing condition, and that they and...

For 5(a) studies, the study report, planning document and combined National Environmental Policy Act (NEPA) analysis are submitted to the agency head for review and subsequent transmittal to Congress, which decides the final disposition of the river.

For 5(d)(1) studies, the study report and combined NEPA analysis (if conducted as a separate study), or study report prepared from the underlying land management plan, are submitted through the study agency and its respective department for review. The final study report is transmitted by the appropriate Secretary to Congress, which...

Examples include, but are not limited to, bank stabilization/revetments; bridges (e.g., abutments, piers, approaches); emergency repairs; channelization; channel restoration; culverts; dams and dam removal; dredging or excavation; fish habitat/passage restoration or enhancement; gravel mining; in-channel transmission towers; levees; pipelines; recreation facilities such as boat ramps and fishing piers; water diversions/wells; and activities that are authorized under Section 404 of the Clean Water Act by the United States Army Corps of Engineers (ACOE).


Review of...

In agency parlance used for planning purposes, river “areas” include the entire length of a study or designated river and its adjacent lands, an average of 320 acres per river mile (except on certain other rivers as specified by Congress and in Alaska, which is 640 acres for rivers located outside national parks). A river “segment” is a portion of the river area which has been delineated for evaluation and planning purposes. Its subsequent classification is dependent upon the level of development of the shoreline, watercourse and access at the time of designation. Significantly different...

The federal government has rarely exercised its eminent domain powers with respect to wild and scenic rivers. Of the 226 rivers in the National Wild & Scenic Rivers System as of June 2022, condemnation for fee title has been used on only four rivers. Nearly all of the federal government’s use of condemnation occurred in the early years of the Wild & Scenic Rivers Act’s implementation when the attitudinal climate was one of federal acquisition. Similarly, the use of scenic easement condemnation has also been used very rarely, and then only on seven rivers, all designated prior to...

Yes. The ability of the owner to buy, sell, donate, or leave property to heirs is unaffected by the Wild & Scenic Rivers Act. Landowners who sell should inform the new owner of any easement transferred with the title.

It is important to develop and apply standardized criteria through a documented evaluation process that may include a screening for potential wild and scenic rivers. If there doubt, evaluate the river according to the criteria in the Wild & Scenic Rivers Act, i.e., free-flowing condition and outstandingly remarkable values.

It depends on whether the collecting activity is commercial or noncommercial in nature and subject to river-administering agency regulation. Mining under the 1872 mining law is a commercial and business activity tied to valid existing rights of claims and is regulated as such (36 CFR 228, 43 CFR 3809, 8365, et al).

Non-commercial mineral collecting for recreational purposes (e.g., hobby collecting, rock-hounding, gold panning, sluicing, or dredging) may be authorized by the Bureau of Land Management or the U.S. Forest Service depending on the amounts collected, size and scale of...

No. Non-indigenous species need not be removed unless they are degrading other important resource values. Practical considerations, such as the effort or expense of eradicating a non-indigenous species and its importance (e.g., game species), should also be considered. This issue is generally addressed in the management plan.

River access is evaluated in the land use planning process.  Specific access needs for public enjoyment, as well as any limitations, are determined in the river management plan.  In keeping with the requirements of the Wild & Scenic Rivers Act, “wild” rivers are generally inaccessible, except by trail (no roads); “scenic” rivers are accessible by road, which generally don’t parallel the river; and “recreational” rivers may have parallel or crossing road and railroad access.

Generally, existing livestock grazing practices and related structures are not affected by designation. The Interagency Guidelines state that agricultural practices should be similar in nature and intensity to those present in the area at the time of designation, and that grazing may be compatible with all river classifications (wild, scenic or recreational). Grazing and other public uses may occur in a wild and scenic river corridor as long as the uses do not adversely impact or otherwise degrade the values for which a river was designated.

Administering agencies do not have any authority to control public use of private lands. Granting of access remains the owner’s responsibility and trespass is handled by local law enforcement authorities. Federal river-administering agencies do, however, work closely with landowners to minimize problems through brochures and maps, signs, etc., and many landowners feel they are better off with the agency taking some responsibility.

Congress may classify the river upon the date of designation or authorize classification by the managing agency.  In the latter case, managing agencies have one year to finalize the boundary, identify the appropriate classification, and publish a notice in the Federal Register.  The agency has three years to complete a management plan.  For Section 2(a)(ii) rivers, classification would be established when the Secretary of the Interior designates the river.

Wild and scenic rivers may qualify as a Section 4(f) property, but designation of a river under the Wild & Scenic Rivers Act does not invoke Section 4(f) in the absence of significant Section 4(f) attributes and qualities. The Federal Highway Administration (FHWA), in consultation with the river-administering agency, determines on a case-by-case basis whether Section 4(f) applies. For example, Section 4(f) may apply to reaches of designated wild and scenic rivers that are publicly owned, open to the public and include recreation as a primary purpose, feature, attribute, or value....

Yes. Section 7(b) of the Wild & Scenic Rivers Act provides the same protection to study rivers authorized by Congress, except that the qualifying word “unreasonably” does not appear before “diminish” for projects located above, below, or on a stream tributary to the study segment’s boundaries. The intent and effect is to provide greater protection for study rivers from proposed hydroelectric facilities or other federally assisted water resource projects during the time-limited study process. Identical protection from water resource projects also applies to rivers that were previously...

Rivers included in the National Wild & Scenic Rivers System by act of Congress (under Section 3(a) of the Wild & Scenic Rivers Act) are administered by one of four federal agencies: Bureau of Land Management (BLM), National Park Service (NPS), U.S. Forest Service (USFS), and/or U.S. Fish & Wildlife Service (FWS) as specified in the legislation. Rivers included in the National Wild & Scenic Rivers System at the request of a governor and designated by the Secretary of the Interior (under Section 2(a)(ii) of the Wild & Scenic Rivers Act) are administered by the respective...

Once determined eligible, river segments are tentatively classified for study as either wild, scenic, or recreational based on the level of development of the shoreline, watercourse and access at the time of river is found eligible. If designated by Congress, the river’s enabling legislation generally specifies the classification.

Yes. Fishing and hunting are regulated under state laws. Where hunting and fishing were allowed prior to designation, they may continue. The river-administering Secretary may, however, designate no hunting zones or periods in which no hunting is allowed for public safety or other reasons. The Secretary must issue such regulation in consultation with the wildlife agency of the state(s).

Easements on private lands acquired for the purposes of protecting wild and scenic rivers do not provide public access unless this right was specifically acquired from the private landowner. A trail or road easement by necessity would involve public use provisions. Any provisions for public use of private lands must be specifically purchased from the landowner.

There are three instances when federal agencies assess eligibility: 1) at the request of Congress through specific authorized studies; 2) through their respective agency inventory and planning processes; or 3) during National Park Service evaluation of a Section 2(a)(ii) application by a state. River areas identified through the inventory phase are evaluated for their free-flowing condition and must possess at least one outstandingly remarkable value.

Yes. In some river study authorizations Congress has required the study agency to work with state and local governments and the public to develop a CRMP in concert with the study process to assist in determination of the river’s suitability. Such pre-designation CRMPs have, in some cases, been adopted in the legislation adding the river to the National Wild & Scenic Rivers System. In cases where Congress has not authorized a pre-designation CRMP, agencies have taken the initiative to develop elements of the CRMP in the study report (pre-designation).

The study report for a congressionally authorized Section 5(a) study river is required to be forwarded by the study agency within the period specified in Section 5(b). This study report must be forwarded to Congress no matter what the outcome of the study.

Unlike the firm deadlines established for Section 5(a) study reports, the Act is silent in regard to Section 5(d)(1) rivers. Thus the river-administering agencies have considerable latitude in how and when to transmit the study report for rivers they have found suitable and are recommending to Congress for designation. The...

Section 16(b) of the Wild & Scenic Rivers Act defines a river as “a flowing body of water or estuary, or a section, portion, or tributary thereof, including rivers, streams, creeks, runs, kills, rills, and small lakes.”

No. The designation does not supersede existing, valid water rights.

 

Water law is a complex legal area, and water rights are a highly contentious issue. Whenever a water allocation issue arises, a river manager should consult with staff with water rights expertise and, as necessary, seek legal counsel.

A river authorized for study under Section 5(a) of the Wild & Scenic Rivers Act is subject to the conditions and restrictions specified in Sections 7(b), 8(b), 9(b), and 12(a) of the Act.

The river is protected for the duration of the study plus up to three years after the required report is submitted (along with the President’s recommendation) to Congress. Should Congress not act within the three-year time frame, the river is no longer afforded protection by the Wild & Scenic Rivers Act. In cases where a study has not been submitted to Congress, the statutory protections...

Yes, but with many restrictions. It is important to note that condemnation is a tool that has been used only rarely on wild and scenic rivers. The objective of wild and scenic river designation is to protect and, as possible, enhance the values which caused the river to be designated. Should some proposed or actual use clearly threaten the values the river was designated to protect, the river managing agency would work with a landowner to explore ways to avert the threat through local zoning, state provisions, land exchanges, or purchases on a willing-seller/willing-buyer basis....

Yes, a federal reserved water right is generally adjudicated in state court (e.g., basin-wide adjudication) in the western United States. It is less clear how federal reserved water rights are adjudicated in the eastern United States. Contact a staff expert and/or legal counsel when trying to protect water quantity.

 

Water law is a complex legal area, and water rights are a highly contentious issue. Whenever a water allocation issue arises, a river manager should consult with staff with water rights expertise and, as necessary, seek legal counsel....

Some examples of other similar outstandingly remarkable values include botanical, hydrological, paleontological, scientific, or heritage values.

Rivers in Alaska outside of national parks and Elkhorn Creek in Oregon (640 acres per river mile) exceed the 320 acre average.

Timber management activities on non-federal lands outside the corridor are guided by state and local authorities. The river manager may provide technical assistance and/or work with state/local governments to protect river values.

The need to clarify a segment division should be identified as a management concern/public issue during the planning process and considered in establishment of the initial boundary. The proposed clarification associated with establishment of initial boundaries must be undertaken with full public input and disclosure and is often completed during development of the comprehensive river management plan (CRMP).

In rare instances where the agency did not define the segment division to fit on-the-ground practicalities (e.g., a terminus described in legislation as “from the bridge”...

Most current uses and activities on rivers and adjoining federal lands may continue. Of primary consideration in any river or land-use limitation is the protection and enhancement of the free-flowing condition, water quality, and outstandingly remarkable value(s) that resulted in the river’s designation. Those uses that clearly threaten these values will be addressed in the planning process, or through site-specific environmental analyses on a case-by-case basis where federal lands are involved.

Yes. The “equal footing” principle of the Constitution and the Submerged Lands Act of 1953 afford each state the ownership of lands and natural resources under navigable rivers. These submerged lands generally extend from bank-to-bank or to the mean or ordinary high water mark.

No. Lands owned by a state may be acquired only by donation or exchange per Section 6(a)(1) of the Wild & Scenic Rivers Act.

Boundaries are measured from the ordinary high water mark of the outermost stream channel. That is, boundaries will be measured from the outermost braid unless otherwise specified by Congress. This is typically considered during the suitability determination and in the development of the final river corridor boundary.

No. There are no special provisions limiting overflights of components of the National Wild & Scenic Rivers System. Certain designated wild and scenic rivers are located by coincidence within restricted overflight areas, but were not the cause of the restriction. Altitude restrictions for civil aircraft in the United States under Federal Aviation Administration (FAA) regulations (e.g, 14 CFR 91.119 and 91.515 which apply to U.S. airspace) and altitude guidelines in the Airman’s Information Manual (Section 4, paragraph 7-4-6) apply to certain chartered areas. The FAA has entered into...

The Wild & Scenic Rivers Act requires that detailed boundaries portrayed on maps be established and submitted to Congress within one year of designation. Agencies may finalize boundaries through their respective land management planning process.

Pending the establishment of detailed river boundaries, the Wild & Scenic Rivers Act specifies that the interim boundary is one-quarter mile on each side of the river as measured from the ordinary high water mark.

Section 3(b) of the Wild & Scenic Rivers Act states:

The agency charged with the...

No.  The Interagency Wild & Scenic River Guidelines state, “There are no specific requirements concerning the length or the flow of an eligible river segment.  A river segment is of sufficient length if, when managed as a wild, scenic or recreational river area, the outstandingly remarkable values are protected.  Flows are sufficient if they sustain or complement the outstandingly remarkable values for which the river was designated.

Congress declared its intent to protect the water quality of rivers added to the National Wild & Scenic Rivers System in Section 1(b) of the Wild & Scenic Rivers Act. Congress further specified that the river-administering agencies cooperate with the EPA and state water pollution control agencies to eliminate or diminish water pollution (Section 12(c)).

Wild and scenic river status does not provide federal authority to regulate private lands. The river-administering agency will cooperate with state and local agencies to appropriately monitor and evaluate activities on private land. If such activities (existing or potential) threaten or are incompatible with the values that contributed to the river’s designation, then, to the extent necessary, mitigation will be accomplished in cooperation with landowners and federal, state and local agencies.

In the Wild & Scenic Rivers Act, river values identified include scenic, recreational, geologic, fish and wildlife, historic, cultural, or other similar values. The Wild & Scenic Rivers Act does not further define outstandingly remarkable values. However, agency resource professionals have developed interpretive criteria for evaluating river values (unique, rare, or exemplary) based on professional judgment on a regional, physiographic, or geographic comparative basis. (Refer to The Wild & Scenic River Study Process (1999).)

These facilities will be provided if they are consistent with the management plan for each river and if funds are available.

No, there is no statutory requirement that a CRMP be revisited in a specified timeframe. However, the federal wild and scenic river-administrator should periodically review monitoring information to determine if there is a need for change in existing direction to ensure values are protected and enhanced. Agency unit-wide plans that are revised following a CRMP-specific plan amendment will follow individual agency practices for plan revision. In some cases, this may include updating the CRMP during the agency unit-plan revision cycle.

Differences include, but are not limited to, the following areas:

  1. Motorized boats and other motors may be allowed in wild and scenic rivers classified as wild, whereas the administering Secretary has the discretion to continue the use of motorized boats and airplane landings in wilderness where such uses are traditionally established. In areas that are both a wild and scenic river and wilderness, the most restrictive provisions of the two acts apply, subject to any area-specific legislative language.

  2. New dams are prohibited in wild and scenic rivers. The...

Timber management activities on non-federal lands within wild and scenic river corridors are guided by state and local authorities. Under the Wild & Scenic Rivers Act, the only way the federal government can restrict private timber management is through purchase of timber rights (in easement or fee title). The river manager may provide technical assistance and/or work with state/local governments to protect river values.

Once such a river segment has been found to be ineligible, the agency will describe the basis for this finding in the study report and follow its internal procedures to transmit the report to the Congress in accordance with Section 7(b) of the Wild & Scenic Rivers Act.

The economic impacts of implementing various alternatives should be addressed through the evaluation process to determine whether a river is a suitable addition to the National Wild & Scenic Rivers System or through the river management planning process, or a designated wild and scenic river. Economic issues, such as development and ecotourism, both inside and outside of potentially designated river corridors may be considered.

Yes.  There are three classifications (wild, scenic and recreational) that may be applied to a particular river segment. Distinct segments along the designated reach may contain differing and non-overlapping classifications (wild, scenic, or recreational), e.g., a 100-mile wild and scenic river may be classified as wild for 50 miles, scenic for 30 miles, and recreational for 20 miles.