Yes. Water may be secured through a variety of protection strategies, in the interim. Ultimately, the United States should secure a federal reserved water right in state court or the appropriate forum. Interim measures may include, but are not limited to: state instream flow programs, reservoir operation schedules, endangered species flow recommendations, conservation techniques, cooperative agreements, and water right purchases from willing sellers.

 

Water law is a complex legal area, and water rights are a highly contentious issue. Whenever a water...

A Section 5(d)(1) study river is protected to the extent of each study agency’s authority and not by the Wild & Scenic Rivers Act. Each agency’s policy is to protect eligible rivers and rivers determined suitable for designation for the life of the respective agency land use plan. A river determined not suitable for designation need no longer be protected as a potential addition to the National Wild & Scenic Rivers System once the study, with its related decision document, is completed.

Agency officials are required to coordinate when their responsibilities relevant to wild and scenic rivers overlap.  Officials should determine the level of study to be conducted, who will lead the study, and, to the extent necessary and feasible, prepare a joint document for submission to Congress or congressional delegations.

Once such a river segment has been found to be ineligible, the agency will describe the basis for this finding in the study report and follow its internal procedures to transmit the report to the Congress in accordance with Section 7(b) of the Wild & Scenic Rivers Act.

Wild and scenic river designation seeks to protect and enhance a river’s current condition. Generally, the classification of the river reflects the level of development at the time of designation, and future development levels must be compatible with such classification. Any proposed new developments on federal lands must be guided by land use and resource management objectives that are compatible with the river’s classification.

Rivers designated under Section 3(a) of the Wild & Scenic Rivers Act, and most designated under Section 2(a)(ii), are classified in one of three categories depending on the extent of development and accessibility along each section. Designated river segments are classified and administered under one of the following, as defined in Section 2(b) of the Wild & Scenic Rivers Act:

...

The Wild & Scenic Rivers Act expressly prohibits the Federal Energy Regulatory Commission (FERC) from licensing the construction of a hydroelectric project or project works (e.g., facilities such as the powerhouse, access roads, transmission lines) under Part 1 of the Federal Power Act “on or directly affecting” a designated wild and scenic river. However, on the few rivers with a FERC-licensed hydroelectric project/project works within the river’s boundaries at the time of designation, existing operations may continue.

Relicensing of existing FERC-licensed hydroelectric...

Eligibility findings are made as a part of a congressionally authorized study under Section 5(a), or pursuant to agency inventory and planning under Section 5(d)(1).  For Section 2(a)(ii) rivers, the National Park Service will make an eligibility determination under authority delegated by the Secretary of the Interior following application by the governor(s) for federal designation.

Differences include, but are not limited to, the following areas:

  1. Motorized boats and other motors may be allowed in wild and scenic rivers classified as wild, whereas the administering Secretary has the discretion to continue the use of motorized boats and airplane landings in wilderness where such uses are traditionally established. In areas that are both a wild and scenic river and wilderness, the most restrictive provisions of the two acts apply, subject to any area-specific legislative language.

  2. New dams are prohibited in wild and scenic rivers. The...

Yes. Such projects may be constructed to protect and enhance fish and wildlife. In-channel structures (e.g., placement of large wood to replicate natural stream conditions) and in-channel activities (e.g., dredging to protect listed species) are acceptable, provided they do not have a direct and adverse effect on the values of the river (its free-flowing condition, water quality, and outstandingly remarkable values. Similarly, in-channel habitat projects may also be constructed below/above a designated river so long as they do not unreasonably diminish the scenic, recreational, and fish...

For rivers designated under Section 3(a) of the Wild & Scenic Rivers Act, a state’s responsibilities include:

  • Regulating and enforcing fishing and hunting regulations.

  • Adjudicating water rights and appropriation.

  • Developing and administering water quality standards.

  • Administering state land use regulations on non-federal lands.
  • Managing state lands and facilities along the river (e.g., state highways, parks, forests).

Upon congressional authorization for a study (Section 5(a)) or by federal agency initiative (Section 5(d)(1)).

Yes. There are four other principal agencies with authority on rivers, including wild and scenic rivers, in the United States. The EPA has authority to protect water quality; the Army Corps of Engineers (ACOE) has jurisdiction for water resources projects; the U.S. Coast Guard (USCG) has jurisdiction on inland navigable waters, vessel inspecting and licensing, safety and boating enforcement, aids to navigation, and permitting of bridges; and the Federal Energy Regulatory Commission (FERC) has authority to license the construction of hydroelectric projects.

No. Lands owned by a state may be acquired only by donation or exchange per Section 6(a)(1) of the Wild & Scenic Rivers Act.

Corridors may not exceed an average of 320 acres per river mile over the designated portion of the river (except on certain other rivers as specified by Congress and in Alaska, which is 640 acres for rivers located outside national parks). Agencies delineate boundaries based on natural or manmade features (canyon rims, roads and ridge tops, etc.) and legally identifiable property lines.

Yes. River-administering agencies have an affirmative duty to evaluate pre-existing uses on federal lands to determine whether such uses are protecting the values for which the wild and scenic river was designated. Grazing may continue when consistent with protecting river values. If grazing practices are determined to be inconsistent with wild and scenic river management objectives, then changes in grazing practices may be required.

No. The designation does not supersede existing, valid water rights.

 

Water law is a complex legal area, and water rights are a highly contentious issue. Whenever a water allocation issue arises, a river manager should consult with staff with water rights expertise and, as necessary, seek legal counsel.

Yes.  The federal agency should consider a wide variety of internal and external sources from which to identify potentially eligible rivers.  These sources may include:  American Rivers’ “Outstanding Rivers List,” statewide river inventories/assessments, published guidebooks, etc.  The important point is to develop and apply standardized criteria through a documented evaluation process for potential wild and scenic rivers.

Yes. Congress has frequently added wild and scenic river status to rivers flowing through national parks, national wildlife refuges, and designated wilderness. Each designation recognizes distinct values for protection, and management objectives generally designed to not conflict. In some cases, wild and scenic river designations extend beyond the boundaries of other administrative or congressional area designations, thereby providing additional protection to the free-flowing condition and river values of the area. Section 10(b) of the Wild & Scenic Rivers Act addresses potential...

Easements on private lands acquired for the purposes of protecting wild and scenic rivers do not provide public access unless this right was specifically acquired from the private landowner. A trail or road easement by necessity would involve public use provisions. Any provisions for public use of private lands must be specifically purchased from the landowner.

Landowners can charge a fee for crossing private lands to fish, except where a public access easement exists. The designation of a wild and scenic river does not change landowner rights unless all, or a portion of those use rights, are acquired from the landowner.

There are more appropriate and cost-effective ways to ensure resource conservation along wild and scenic rivers than using the Wild & Scenic Rivers Act’s condemnation authority. (Refer to Protecting Resource Values on Non-federal Lands (1996).)

Agencies may acquire properties using appropriated funds under the Land and Water Conservation Fund Act or other authorities. Owners are contacted in order to see if an exchange or voluntary purchase can be negotiated.

For state-designated rivers, a governor may submit an application to the Secretary of the Interior under Section 2(a)(ii) of the Act.  If found eligible, and if sufficient protection is afforded by the state, the Secretary may make the designation.  Rivers designated in this manner continue to be administered by the state (sometimes with assistance from local governments), except for any federal lands along the river.  If there are federal lands located along the river, the state and federal river-administering agencies may enter into an agreement to outline federal/state...

There are a number of steps that federal agencies use in their evaluation process:

  • Assessment of free-flowing condition and resource values.
  • Finding of eligibility or ineligibility.
  • Inventoried or tentative classification based on the development of shoreline, watercourse, and access.
  • Establishment of tentative, preliminary, or proposed boundaries and/or river areas.
  • Establishment of protective management requirements for eligible rivers.

Regardless of the study agency’s eligibility and suitability findings, a Section 5(a) study river is protected by the conditions and restrictions specified in Sections 7(b), 8(b), 9(b), and 12(a) of the Wild & Scenic Rivers Act during the period of the study, plus up to three years after the required report is submitted to Congress. In other words, these protections are independent of the recommendation of the study, allowing for Congressional consideration.

Prior to 1986, Section 3(b) of the Wild & Scenic Rivers Act required the river-administering agency to “prepare a plan for necessary developments in connection with its administration in accordance with such classification.” Through a generic amendment of the Wild & Scenic Rivers Act in 1986, Section 3 was amended with a new subsection requiring a “comprehensive management plan . . . to provide for protection of the river values” (Section 3(d)(1)). The comprehensive river management plan (CRMP) must address:

  1. Resource protection;

  2. Development of lands...

No.  The Interagency Wild & Scenic River Guidelines state, “There are no specific requirements concerning the length or the flow of an eligible river segment.  A river segment is of sufficient length if, when managed as a wild, scenic or recreational river area, the outstandingly remarkable values are protected.  Flows are sufficient if they sustain or complement the outstandingly remarkable values for which the river was designated.

The need to clarify the terminus should be identified as a management concern/public issue during the planning process and considered in establishment of the initial boundary. The proposed clarification associated with establishment of initial boundaries must be undertaken with full public input and disclosure and is often completed during development of the comprehensive river management plan (CRMP).

In rare instances where the agency did not define the terminus to fit on-the-ground practicalities (e.g., a terminus described in legislation as “from the dam” included a dam and dam-...

It is important to develop and apply standardized criteria through a documented evaluation process that may include a screening for potential wild and scenic rivers. If there doubt, evaluate the river according to the criteria in the Wild & Scenic Rivers Act, i.e., free-flowing condition and outstandingly remarkable values.

Boundaries are measured from the ordinary high water mark of the outermost stream channel. That is, boundaries will be measured from the outermost braid unless otherwise specified by Congress. This is typically considered during the suitability determination and in the development of the final river corridor boundary.

No restrictions to private lands may be applied under the Wild & Scenic Rivers Act. Comprehensive river management plans may establish goals for new construction consistent with classification. There is a wide range of uses compatible with these classifications so long as the overall values and character of the river corridor is maintained. Any effect on private lands would be through state or local zoning. Federal acquisition of lands or development rights would require landowner compensation.

Through the various federal agencies’ land management planning processes and initiatives by the public, a significant number of rivers have been identified for study as potential additions to the National Wild & Scenic Rivers System. For example, the Nationwide Rivers Inventory (NRI), maintained by the National Park Service, has identified over 3,400 river segments as potential candidates for study and/or inclusion into the National System.

No, not unless necessary to protect public safety, the river’s water quality, or other resource values. Recreational use of our nation’s rivers is increasing in both magnitude and extent, i.e., the types of recreational activities pursued and the technologies being used. Whether and how to restrict recreational use is a key issue in the planning process, which includes extensive local, regional, and national public involvement.

Projects with the following attributes are generally considered most harmonious with river ecosystems:

  • Those made of native materials, e.g., wood, rock, vegetation, and so forth that are similar in type, composition or species to those in the vicinity of the project.
  • Those using construction materials that are natural in appearance, e.g., logs with bark intact as opposed to being peeled and whole naturally weathered rocks as opposed to split or fractured (i.e., riprap).
  • Those with materials placed in locations, positions, and quantities mimicking natural...

No. Under the Wild & Scenic Rivers Act, the federal government has no authority to regulate or zone private lands. Land use controls on private lands are solely a matter of state and local zoning. Although the Wild & Scenic Rivers Act includes provisions encouraging the protection of river values through state and local governmental land use planning, there are no binding provisions on local governments. In the absence of state or local river protection provisions, the federal government may seek to protect values by providing technical assistance, entering into agreements with...

Yes. The ability of the owner to buy, sell, donate, or leave property to heirs is unaffected by the Wild & Scenic Rivers Act. Landowners who sell should inform the new owner of any easement transferred with the title.

Timber management activities on federal lands outside the corridor are managed to protect and enhance the values that caused the river to be designated. Measures needed to protect and enhance the river’s values are developed through the river planning process and include management direction as necessary for lands adjacent to the corridor.

Yes, if they are consistent with management objectives for the river and do not degrade water quality or the outstandingly remarkable values for which the river was designated.

Once determined eligible, river segments are tentatively classified for study as either wild, scenic, or recreational based on the level of development of the shoreline, watercourse and access at the time of river is found eligible. If designated by Congress, the river’s enabling legislation generally specifies the classification.

Most rivers have flexible boundaries to accommodate specific features and river values. (Refer to Establishment of Wild and Scenic River Boundaries (1998).)

Generally, existing livestock grazing practices and related structures are not affected by designation. The Interagency Guidelines state that agricultural practices should be similar in nature and intensity to those present in the area at the time of designation, and that grazing may be compatible with all river classifications (wild, scenic or recreational). Grazing and other public uses may occur in a wild and scenic river corridor as long as the uses do not adversely impact or otherwise degrade the values for which a river was designated.

Section 6(a)(1) of the Wild & Scenic Rivers Act states:

The Secretary of the Interior and the Secretary of Agriculture are each authorized to acquire lands and interests in land within the authorized boundaries of any component of the national wild and scenic rivers system designated in Section 3 of this act . . . but he shall not acquire fee title to an average of more than 100 acres per mile on both sides of the rivers.

The Wild & Scenic Rivers Act authorizes fee title acquisition to the equivalent of about a 400 foot wide strip of land...

No. However, all treatments must protect river values. Treatment methods that also include in-channel activity (e.g. dredging) are subject to review under Section 7(a) as water resources project.

There are no known studies comparing river use levels before and after wild and scenic river designation with changes in use levels of similar non-wild and scenic rivers. Factors other than wild and scenic river designation (i.e., river and water attributes, access to the river, and availability of facilities and commercial services) are considered to be the major influences on river use levels. For wild and scenic rivers, as for other rivers managed by federal agencies, the implementation of permit systems or other limits of use are typically undertaken when use exceeds an acceptable...

In many cases, there may be no practical effect. However, laws like the Wilderness Act do allow certain activities in designated wilderness which may be incompatible on a wild and scenic river, e.g., water resource developments if authorized by the President. In addition, wild and scenic river designation prohibits federal participation in, or assistance to, water resource developments upstream or downstream of a designated river (potentially outside the wilderness area) which may adversely affect the designated river segment. Agencies are required by policy and law to evaluate potential...

No, there is no statutory requirement that a CRMP be revisited in a specified timeframe. However, the federal wild and scenic river-administrator should periodically review monitoring information to determine if there is a need for change in existing direction to ensure values are protected and enhanced. Agency unit-wide plans that are revised following a CRMP-specific plan amendment will follow individual agency practices for plan revision. In some cases, this may include updating the CRMP during the agency unit-plan revision cycle.

A river identified for study under Section 5(d)(1) is protected by each agency’s policy; i.e., the Wild & Scenic Rivers Act provides no statutory protections. To the extent of each agency’s authority, the river’s free-flowing condition, water quality, outstandingly remarkable values, and classification are protected. Prior to a suitability study, the inventoried classification is protected. If, as the result of a suitability study, a less restrictive classification is recommended for a river or portion thereof, the agency is obligated to protect this recommended classification.

Local government entities are encouraged by federal wild and scenic river-administering agencies to provide for the protection of wild and scenic river values in their land use plans, including the use of zoning and other land use measures. Their participation in development of the comprehensive river management plan (CRMP) in areas of mixed ownership is essential to ensure an enduring planning strategy that protects river values and respects the rights of landowners. In some cases, local governments have chosen to strengthen land-use requirements during a wild and scenic river study, in...

Ideally one coordinated CRMP is developed with each wild and scenic river-administering agency documenting its respective decisions. In a few cases, separate plans may be required. However, even in this case, the planning process is conducted jointly to the greatest extent possible to ensure consistency of outstandingly remarkable values, classification, standards, and monitoring.

No. Federal agencies do not have the authority to reimburse landowners for damage to their lands as a result of public use. However, wild and scenic river designation is unlikely to increase or invite vandalism. Granting access remains the owner’s responsibility and vandalism is handled by local law enforcement authorities. Federal river-administering agencies do, however, work closely with landowners to minimize problems through brochures and maps, signs, etc., and many landowners feel they are better off with the agency taking some responsibility.