Prior to 1986, Section 3(b) of the Wild & Scenic Rivers Act required the river-administering agency to “prepare a plan for necessary developments in connection with its administration in accordance with such classification.” Through a generic amendment of the Wild & Scenic Rivers Act in 1986, Section 3 was amended with a new subsection requiring a “comprehensive management plan . . . to provide for protection of the river values” (Section 3(d)(1)). The comprehensive river management plan (CRMP) must address:

  1. Resource protection;

  2. Development of lands...

WSR designation seeks to protect and enhance a river’s current natural condition and provide for public use consistent with retaining those values. Designation affords certain legal protection from adverse development, e.g., no new dams may be constructed, nor federally assisted water resource development projects allowed that are judged to have an adverse effect on designated river values. Where private lands are involved, the federal managing agency will work with local governments and owners to develop voluntary protective measures.

Generally, existing agricultural and grazing practices, and related structures are not affected by designation. The Wild & Scenic Rivers Act does not give federal agencies authority to regulate private land. Consequently, the only effect of designation is to authorize the purchase of easements within the river corridor, and to enable federal agency staff to provide technical assistance to private landowners interested in reducing impacts on the river’s water quality and riparian integrity.

In agency parlance used for planning purposes, river “areas” include the entire length of a study or designated river and its adjacent lands, an average of 320 acres per river mile (except on certain other rivers as specified by Congress and in Alaska, which is 640 acres for rivers located outside national parks). A river “segment” is a portion of the river area which has been delineated for evaluation and planning purposes. Its subsequent classification is dependent upon the level of development of the shoreline, watercourse and access at the time of designation. Significantly different...

Wild and scenic river designations generally cause property values to remain stable or increase. For example, see Economic Benefits of Conserved Rivers: An Annotated Bibliography (Porter, B., Collier, S., Becerra, N., and Schultz, J. 2001. National Park Service – Rivers and Trails Conservation and Assistance Program, Washington, DC. 27pp.).

On September 7, 1982, the Departments of Agriculture and the Interior outlined in the Federal Register (47 FR 39454) eligibility and classification criteria, the evaluation process and content, and reporting requirements for potential wild and scenic rivers and management guidelines for designated wild and scenic rivers. These guidelines were formulated to provide a uniform evaluation and consistent management approach in the identification, evaluation, reporting, and management of wild and scenic river segments. These replaced earlier guidelines developed in 1970.

Rivers included in the National Wild & Scenic Rivers System by act of Congress (under Section 3(a) of the Wild & Scenic Rivers Act) are administered by one of four federal agencies: Bureau of Land Management (BLM), National Park Service (NPS), U.S. Forest Service (USFS), and/or U.S. Fish & Wildlife Service (FWS) as specified in the legislation. Rivers included in the National Wild & Scenic Rivers System at the request of a governor and designated by the Secretary of the Interior (under Section 2(a)(ii) of the Wild & Scenic Rivers Act) are administered by the respective...

Projects with the following attributes are generally considered most harmonious with river ecosystems:

  • Those made of native materials, e.g., wood, rock, vegetation, and so forth that are similar in type, composition or species to those in the vicinity of the project.
  • Those using construction materials that are natural in appearance, e.g., logs with bark intact as opposed to being peeled and whole naturally weathered rocks as opposed to split or fractured (i.e., riprap).
  • Those with materials placed in locations, positions, and quantities mimicking natural...

The need to clarify a segment division should be identified as a management concern/public issue during the planning process and considered in establishment of the initial boundary. The proposed clarification associated with establishment of initial boundaries must be undertaken with full public input and disclosure and is often completed during development of the comprehensive river management plan (CRMP).

In rare instances where the agency did not define the segment division to fit on-the-ground practicalities (e.g., a terminus described in legislation as “from the bridge”...

(*For certain rivers, Congress directed the river-administering agency in Section 3(b) to determine which classes “best fit the river or its various segments.”  These administratively segmented rivers should reflect on-the-ground practicalities and, therefore, are unlikely to require subsequent amendment.)

Yes. While Congress specifies the segment divisions of a designated river, in some instances congressional language may require interpretation. For example, a segment division between a wild and scenic classification described as “from the bridge”...

No. Non-indigenous species need not be removed unless they are degrading other important resource values. Practical considerations, such as the effort or expense of eradicating a non-indigenous species and its importance (e.g., game species), should also be considered. This issue is generally addressed in the management plan.

Section 10(a) of the Wild and Scenic Rivers Wild & Scenic Rivers Act directs that:

Each component of the national wild and scenic rivers system shall be administered in such manner as to protect and enhance the values which caused it to be included in said system without, insofar as is consistent therewith, limiting other uses that do not substantially interfere with public use and enjoyment of these values.

In its technical report on managing wild and scenic rivers (Wild and Scenic River Management Responsibilities (2002)) the...

Yes. There are four other principal agencies with authority on rivers, including wild and scenic rivers, in the United States. The EPA has authority to protect water quality; the Army Corps of Engineers (ACOE) has jurisdiction for water resources projects; the U.S. Coast Guard (USCG) has jurisdiction on inland navigable waters, vessel inspecting and licensing, safety and boating enforcement, aids to navigation, and permitting of bridges; and the Federal Energy Regulatory Commission (FERC) has authority to license the construction of hydroelectric projects.

Yes. The “equal footing” principle of the Constitution and the Submerged Lands Act of 1953 afford each state the ownership of lands and natural resources under navigable rivers. These submerged lands generally extend from bank-to-bank or to the mean or ordinary high water mark.

Yes, a federal reserved water right is generally adjudicated in state court (e.g., basin-wide adjudication) in the western United States. It is less clear how federal reserved water rights are adjudicated in the eastern United States. Contact a staff expert and/or legal counsel when trying to protect water quantity.

 

Water law is a complex legal area, and water rights are a highly contentious issue. Whenever a water allocation issue arises, a river manager should consult with staff with water rights expertise and, as necessary, seek legal counsel....

There are more appropriate and cost-effective ways to ensure resource conservation along wild and scenic rivers than using the Wild & Scenic Rivers Act’s condemnation authority. (Refer to Protecting Resource Values on Non-federal Lands (1996).)

Agencies may acquire properties using appropriated funds under the Land and Water Conservation Fund Act or other authorities. Owners are contacted in order to see if an exchange or voluntary purchase can be negotiated.

Wild and scenic river status does not provide federal authority to regulate private lands. The river-administering agency will cooperate with state and local agencies to appropriately monitor and evaluate activities on private land. If such activities (existing or potential) threaten or are incompatible with the values that contributed to the river’s designation, then, to the extent necessary, mitigation will be accomplished in cooperation with landowners and federal, state and local agencies.

Many individuals and communities support designation to help focus management efforts on protecting and enhancing river values. The intent of the Wild & Scenic Rivers Act is to build partnerships among landowners, river users, tribal nations and all levels of governments in developing goals for river protection. Designation provides strong protection against construction of new dams and projects that alter the free-flowing condition, water quality, and outstandingly remarkable values for which the river was designated.

There are three instances when federal agencies assess eligibility: 1) at the request of Congress through specific authorized studies; 2) through their respective agency inventory and planning processes; or 3) during National Park Service evaluation of a Section 2(a)(ii) application by a state. River areas identified through the inventory phase are evaluated for their free-flowing condition and must possess at least one outstandingly remarkable value.

The Act (Public Law 90-542; 16 U.S.C. 1271-1287) was signed on October 2, 1968. It has been amended many times, primarily to designate additional rivers and authorize additional rivers for study for possible inclusion.

Section 7 of the Wild & Scenic Rivers Act prohibits any department or agency of the United States from assisting in the construction of any water resources project that would have a “direct and adverse” effect on the values for which the river segment was established, namely its free-flowing condition, water quality, and outstandingly remarkable values (outstandingly remarkable values). It also precludes federal assistance to projects below or above a designated river that have been determined to “invade the area or unreasonably diminish the scenic, recreational, and fish and wildlife...

Ideally one coordinated CRMP is developed with each wild and scenic river-administering agency documenting its respective decisions. In a few cases, separate plans may be required. However, even in this case, the planning process is conducted jointly to the greatest extent possible to ensure consistency of outstandingly remarkable values, classification, standards, and monitoring.

River-administering agencies must evaluate proposed water resources projects under the appropriate standard of Section 7. The evaluative standard for projects located within a wild and scenic river corridor, Section 5(a) study area, or qualifying Section 2(a)(ii) application area is whether the project would have a “direct and adverse effect.” The evaluative standard for projects located downstream, upstream, or on a tributary to a wild and scenic river corridor or Section 5(a) study area is whether the project would “invade the area or unreasonably diminish” for designated wild and scenic...

Yes. To withdraw a scenic or recreational river segment, the managing agency must submit a separate public land order or notice of realty action.

Subject to valid existing rights, rivers authorized for study under Section 5(a) of the Wild & Scenic Rivers Act are withdrawn under the mining laws while in study status; this withdrawal covers the bed and bank and federal lands situated within one-quarter mile of the bank on each side of the river. River study areas are not withdrawn from mineral leasing but are subject to conditions determined by the appropriate Secretary necessary to safeguard the area during the study period. However, the bed and bank and federal lands within two miles of the bank of each side of the rivers...

No. Where tribal lands are involved, sovereign tribes retain authority over the lands; however, the river-administering agencies seek opportunities to collaborate in protecting values of joint concern.

No. The protection afforded by Section 7(b) of the Wild & Scenic Rivers Act does not apply to Section 5(d)(1) study rivers. However, the managing agency should, within its authorities, protect the values which make the river eligible or suitable (free-flowing condition, water quality and outstandingly remarkable values).

Review of hydroelectric and federally water resources projects under Section 7 of the Wild & Scenic Rivers Act is complex. Please refer to Wild & Scenic Rivers Act: Section 7 (2004), a technical report of the Interagency Wild and Scenic Rivers...

Yes.  Congress and the Secretary of the Interior have designated many river segments which are above or below dams that have regulated flows.

Yes. While Congress specifies the termini of a designated river, in some instances congressional language may require interpretation. For example, a terminus described as “from the dam” could be interpreted as including the dam and dam-related facilities. However, to allow for continued dam maintenance, it may be appropriate to establish the boundary a very short distance below the dam or, through specific language, to exclude appurtenant facilities.

The river administrator is well advised to consider on-the-ground practicalities at the initial boundary setting stage, to the extent...

There are two ways rivers are designated in the National Wild & Scenic Rivers System:

  • By Act of Congress
    This requires legislation to amend Section 3(a) of the Act.  Rivers designated by Congress are listed in Section 3(a) of the Act.
  • By the Secretary of the Interior
    This requires...

To be eligible for designation, a river must be free-flowing and contain at least one "outstandingly remarkable value," i.e., scenic, recreational, geologic, fish and wildlife, historic, cultural, or other similar value.

No, there is no statutory requirement that a CRMP be revisited in a specified timeframe. However, the federal wild and scenic river-administrator should periodically review monitoring information to determine if there is a need for change in existing direction to ensure values are protected and enhanced. Agency unit-wide plans that are revised following a CRMP-specific plan amendment will follow individual agency practices for plan revision. In some cases, this may include updating the CRMP during the agency unit-plan revision cycle.

Yes. The Wild & Scenic Rivers Act directs other federal agencies to protect river values. It explicitly recognizes the regulatory roles of the Federal Energy Regulatory Commission and the Environmental Protection Agency in protecting wild and scenic rivers, and directs other federal departments and agencies that permit or assist in the construction of water resources projects to do likewise. The role of such federal agencies in water resources project construction may be through regulation, direct funding, or indirectly funding by providing federal assistance to others.

All...

Existing powerline or communication transmission rights-of-way may continue to be used and maintained. New proposals would be evaluated for impacts to river values based on state and local zoning.

Should the purchase of land become necessary, condemnation is typically a last resort and only used when:

  1. Land is clearly needed to protect resource values, or provide necessary access for public recreational use, and a purchase price cannot be agreed upon.

  2. Clear title to a property is needed, in which case condemnation is merely a legal procedure that has nothing to do with government/landowner differences.

The government typically provides technical assistance to find ways to alleviate or mitigate the actual or potential threat(s). Purchasing a partial right (easement) or the property in fee title is usually the last resort. If an easement is purchased, the owner would sell certain development rights and receive a payment, yet retain title to the land.

The communities of interest are key players in the development of a CRMP. They help with data collection and establishing baseline conditions, identifying issues and opportunities to be addressed in the planning process and, increasingly, in monitoring and implementation of aspects of the CRMP. Sections 10(e) and 11(b)(1) of the Wild & Scenic Rivers Act anticipate the participation of federal, state or local governments, landowners, private organizations and/or individuals in planning, protecting and administering wild and scenic rivers.

Section 8(a) of the Wild & Scenic Rivers Act withdraws public (federal) lands within the authorized boundary of a designated component from entry, sale, or other disposition under the public land laws of the United States.

Examples include, but are not limited to, bank stabilization/revetments; bridges (e.g., abutments, piers, approaches); emergency repairs; channelization; channel restoration; culverts; dams and dam removal; dredging or excavation; fish habitat/passage restoration or enhancement; gravel mining; in-channel transmission towers; levees; pipelines; recreation facilities such as boat ramps and fishing piers; water diversions/wells; and activities that are authorized under Section 404 of the Clean Water Act by the United States Army Corps of Engineers (ACOE).


Review of...

Yes. Legal descriptions along with a map are submitted to Congress in accordance with Sections 3(b) and (c) of the Wild & Scenic Rivers Act and are retained by the administering agency. Requests for maps should be made to the agency field offices which administer the specific study or designated river(s).

Section 16(c) of the Wild & Scenic Rivers Act defines a scenic easement as follows:

“Scenic easement” means the right to control the use of land (including the air space above such land) within the authorized boundaries of a component of the wild and scenic river system, for the purpose of protecting the natural qualities of a designated wild, scenic, or recreational river area, but such control shall not affect, without the owner’s consent, any regular use exercised prior to the acquisition of the easement.

While the Wild & Scenic Rivers...

The federal wild and scenic river-administering agency is responsible for implementing the Wild & Scenic Rivers Act’s requirements, including the development of a comprehensive management plan for each river within three full fiscal years from the date of designation. It is also responsible to protect and enhance a river’s values, through its authorities on federal lands and through voluntary, cooperative strategies developed with other governments, tribal nations, and landowners on non-federal lands, and to evaluate water resources projects under Section 7(a).

A range of projects are allowable to restore natural channel processes and habitat, including placement of limited rock and wood, native plantings to stabilize streambanks, and the removal or addition of fish barriers. Such projects are most likely to protect river values, including a river’s free-flowing condition, provided they: 

  1. Mimic the effects of naturally occurring events such as trees falling in and across the river (including the formation of wood jams), boulders tumbling in or moving down the river course, exposure of bedrock outcrops, bank sloughing or...

Yes. The Wild & Scenic Rivers Act anticipates the need for occasional adjustment of the lateral (river corridor) boundary, directing that such amendment follow the same process as described for the initial boundary development in Sections 3(b) and (c) of the Wild & Scenic Rivers Act. The legally established river corridor might require amendment to better reflect protection of outstandingly remarkable values or as the result of identification of a new outstandingly remarkable value.

Yes. Under Section 5(a) of the Wild & Scenic Rivers Act, the public is involved in the study of rivers authorized by Congress. The report associated with a congressionally authorized study addresses subjects such as current status of land ownership and use in the area; reasonably foreseeable potential uses of land and water which would be affected by designation; the federal agency to administer the river if designated; and the ability of, and estimated costs to, state and local agencies to participate in the administration of such rivers. The public and state, local and tribal...

Wild and scenic river designation does not change land ownership or grant new privileges to the public on private lands. If the riverbanks are in private ownership, the landowner continues to control their use after designation. Ownership of the bed and bank of a river may be affected by whether the river is determined navigable.

No. There are no special provisions limiting overflights of components of the National Wild & Scenic Rivers System. Certain designated wild and scenic rivers are located by coincidence within restricted overflight areas, but were not the cause of the restriction. Altitude restrictions for civil aircraft in the United States under Federal Aviation Administration (FAA) regulations (e.g, 14 CFR 91.119 and 91.515 which apply to U.S. airspace) and altitude guidelines in the Airman’s Information Manual (Section 4, paragraph 7-4-6) apply to certain chartered areas. The FAA has entered into...

As of June 2022, some 226 river segments comprising 13,417 miles have been afforded protection in the National System.  These nationally recognized rivers comprise some of the nation’s greatest diversity of recreational, natural, and cultural resources, offering great scientific value and scenic beauty.  By comparison, more than 75,000 large dams across the country have modified at least 600,000 miles, or about 17% of America’s rivers (possibly more than 20% – figures are best estimates).

Landowners can charge a fee for crossing private lands to fish, except where a public access easement exists. The designation of a wild and scenic river does not change landowner rights unless all, or a portion of those use rights, are acquired from the landowner.